CLIENT  JOBS EXECUTED  BOILER   DURATION   VALUE ( in Lacs )
Vizag Steel Plant - Vishakhapatanam Turnkey Piping  
2009-11
 
350
Gandour Food Processing India - Hyderabad Turnkey utility Piping  
3 months
2009
In progress
100
Renfro India Ltd., Sanaswadi-Pune   Turnkey utility piping  
3 months
2008-09
In progress
60
Ordnance Factory, Dehu road Steam distribution system Turnkey project  
1 months
2008-09
55
KSB Ltd., Chinchwad Fire hydrant piping network, Pneumatic piping network  
5.5 months
2008-09
45
Swaraj Dairy, Phaltan Utility piping  
3 months
2007-08
48
Mahendra Forging, Chakan Cooling water system & utility Piping  
4 months 
2007-08
62
Firepro Systems Ltd.,
DLF Project, Hinjewadi 
Fire hydrant piping network  
5.5 months
2007-08
45
K.K.Nag Ltd.,
Ranjangaon,Pune
Turnkey: EPS Plant utility piping & equipment Pressure vessel  
3 months
2007-08
46
Govind Milk, Phaltan Turnkey:250KVA Power plant Used boiler modification & piping  
 4 months
2006-07
58
Jain Irrigation Ltd.,
Jain Food Park Valley, Jalgaon
Turnkey: Innovative SS lined structurally supported chimney 45 meter and 30 meter  
3 months
2006-07
37  
Vintrol Ind. Ltd.,
MIDC-Chinchwad, Pune
Turnkey: Forging Plant structure utility block -Boiler/ Hammer  
3 months
2006-07  
42
Spica Elastic Ltd.,
Hadapsar Inds. Est., Pune  
Turnkey: Steam/ Air/ Oil/ Water piping system. Heavy structure, fuel oil tank [20kl] Water tanks [10kl], Chimney
2tph Forbes  
2 months 
2004-05
52
 
Penguin Alcohols Pvt. Ltd.,
Cancon Goa
Turnkey : Steam/ Water piping system Boiler & Steam Turbine erection Fpb170  
2 months  
2001
55
Datta Chem Ltd., Pune Turnkey : Hydrocarbon processing plant Td100 
3 months
1998-99
 
44 
Thermax Ltd., Seagram dist. Ltd., Nasik
Turnkey : Steam/ Fuel Oil/ Water piping system. Fuel oil tanks, insulation, Bi-drum boiler & equipment erection
Td100 
3 months  
1998-99
44  
Thermax Ltd.,
Site:Mahyco Ltd., Jalna
Turnkey: Steam/ Fuel Oil/ Water piping system Fuel oil tanks, chimney,insulation Boiler chiller equipment erection
Mxp30 
1 months
1996-97  
22  
Weikfield Agro Ltd., Pune
Turnkey : Mushroom processing plant Steam/ Fuel oil/ Water piping system Fuel oil tanks, Chimney, Insulation Boiler chiller equipment erection
Sm60 Sm30  
14 months  
1996-98
82
Jolly Board Ltd., Aurangabad
Turnkey : Steam/ Fuel oil/ Water piping system Boiler & equipment erection, thermal insulation
Td100 2nos 10tph
1 month
1996-97
1.5 months
1998-99
45
*The above list is not an exhaustive data of work undertaken but an indicator of major jobs done for that year.
Overseas Click         Click to Know More

Overseas Engineers and Exporters to Middle East/ Africa and South East Asia.
 
We have executed turnkey installation / repair of boiler projects In Africa, ME and Sri lanka.
We export engineering goods to Sudan, Zanzibar, Sri lanka.
We are in process of opening of our branch in Saif Zone of Sharjah - UAE shortly.
   
CLIENT  JOBS EXECUTED  BOILER   DURATION   VALUE  ( in Lacs )
Zanzibar Sugar Mills Ltd. Africa Re tubing of 3 x 22 tph boilers - & export.   2008-09 50
Metro Rail Project-Dubai Bridge fabrication   2008-09 50
Industrial Clothing’s ltd. Project support - export   2007-08 32
Work Wear Lanka Pvt. Ltd. Project support - export   2007-08 40
Uruvilla Tea Factory Boiler Re tubing   2007-08 12
Lallan Rubbers - Sri Lanka Thermic fluid heating systems   2007-08 20
RAK Sudan Turnkey steam boiler and piping System. Engineering support and exports   2004- Ongoing 75
Uruwilla Tea Factory, Sri lanka   Boiler / Retubing support   
40 days
2007
18
Forbes Marshall Ltd.,
Site: RAK Ceramic, Sudan, Africa
Turnkey :Steam/Air/Oil/Water Piping System. Heavy Structure, Fuel Oil Tank[20kl], Water Tanks [10kl x 2nos] and Water Tanks [10kl x 2nos]
Jnm 3Tph*2
1.5 Months
2004-05
15
 
 

 
 
 
Copyright © 2009 Lotus Engineers. All Rights Reserved. Crafted and Cared By www.ikf.co.in