| CLIENT |
JOBS EXECUTED |
BOILER |
DURATION |
VALUE ( in Lacs ) |
| Vizag Steel Plant - Vishakhapatanam |
Turnkey Piping |
|
|
350 |
| Gandour Food Processing
India - Hyderabad |
Turnkey utility Piping |
|
| 3 months |
|
2009
In progress |
|
100 |
| Renfro India Ltd., Sanaswadi-Pune
|
Turnkey utility piping |
|
| 3 months |
|
2008-09
In progress |
|
60 |
| Ordnance Factory,
Dehu road |
Steam distribution system
Turnkey project |
|
|
55 |
| KSB Ltd.,
Chinchwad |
Fire hydrant piping network,
Pneumatic piping network |
|
|
45 |
| Swaraj Dairy,
Phaltan |
Utility piping |
|
|
48 |
| Mahendra Forging,
Chakan |
Cooling water system & utility
Piping |
|
|
62 |
Firepro Systems Ltd.,
DLF Project, Hinjewadi |
Fire hydrant piping network |
|
|
45 |
K.K.Nag Ltd.,
Ranjangaon,Pune |
Turnkey:
EPS Plant utility piping & equipment
Pressure vessel |
|
|
46 |
| Govind Milk,
Phaltan |
Turnkey:250KVA Power plant
Used boiler modification & piping |
|
|
58 |
Jain Irrigation Ltd.,
Jain Food Park Valley,
Jalgaon |
Turnkey: Innovative SS lined structurally supported chimney 45 meter and 30 meter |
|
|
37 |
Vintrol Ind. Ltd.,
MIDC-Chinchwad, Pune |
Turnkey: Forging Plant structure utility block -Boiler/ Hammer |
|
|
42 |
Spica Elastic Ltd.,
Hadapsar Inds. Est.,
Pune
|
Turnkey: Steam/ Air/ Oil/ Water piping system. Heavy structure, fuel oil tank [20kl] Water tanks [10kl], Chimney |
2tph
Forbes
|
|
52
|
Penguin Alcohols
Pvt. Ltd.,
Cancon Goa |
Turnkey :
Steam/ Water piping system
Boiler & Steam Turbine erection |
Fpb170
|
|
55 |
| Datta Chem Ltd.,
Pune |
Turnkey :
Hydrocarbon processing plant |
Td100 |
|
44 |
| Thermax Ltd.,
Seagram dist. Ltd.,
Nasik |
Turnkey :
Steam/ Fuel Oil/ Water piping system.
Fuel oil tanks, insulation,
Bi-drum boiler & equipment erection |
Td100 |
|
44 |
Thermax Ltd.,
Site:Mahyco Ltd.,
Jalna |
Turnkey:
Steam/ Fuel Oil/ Water piping system
Fuel oil tanks, chimney,insulation
Boiler chiller equipment erection |
Mxp30 |
|
22 |
| Weikfield Agro Ltd.,
Pune |
Turnkey : Mushroom processing plant
Steam/ Fuel oil/ Water piping system
Fuel oil tanks, Chimney, Insulation
Boiler chiller equipment erection |
Sm60
Sm30
|
|
82 |
| Jolly Board Ltd.,
Aurangabad |
Turnkey :
Steam/ Fuel oil/ Water piping system
Boiler & equipment erection,
thermal insulation |
Td100
2nos
10tph |
|
45 |
| *The above list is not an exhaustive data of work undertaken but an indicator of major jobs done for that year. |